Saturday, September 1, 2012

STATE OF MISSION REPORT AUGUST 2012

Omega Pandora operational, POS to surface stable, compression grid activated to LOGN5.9. Master delta LOC in progress. Isidic security breach deflected, HVBN stable, systems security breach in deflection. M increase to 1.5, Dreamland attempt in progress.